Excellent condition Eagle 135 Accepted P.08 Loading Tool. in 1941 the Heereswaffenamt switched inspectors to the team lead by Major Rosenhagen(135) And the tools were accepted E/135 in the later part of 1941 and until the end of production.
Excellent condition Eagle 135 Accepted P.08 Loading Tool. in 1941 the Heereswaffenamt switched inspectors to the team lead by Major Rosenhagen(135) And the tools were accepted E/135 in the later part of 1941 and until the end of production.